Ainthiram Luxe Spaces
Home Makeover · False Ceiling

False Ceiling Design
in Chennai

False ceiling design and installation across Chennai — gypsum, POP, designer profiles. Cove lighting, concealed downlights, drop boxes for fans. Done in 8–14 days, with the dust kept to one room.

False ceiling installation by Ainthiram in Chennai
What we mean

A ceiling that
does the lighting.

A good false ceiling does three things at once — it hides the wires, it lowers a too-tall room into proportion, and it does the lighting. Cove strips wash the walls. Downlights pinpoint the dining table. A drop box centres the fan.

We design ceilings against the room — what's the function, where does the light need to fall, what's the proportion. Then we draw the layout, run the wiring, install the boards, paint, and clean up.

Gypsum (branded boards such as Saint-Gobain or USG Boral) for most rooms — clean, fast, lower-cost. POP for designer profiles, multi-level work, and curves.

Gypsum false ceiling with cove lights
Bedroom with designer ceiling
What's included

Six things in every Ainthiram ceiling.

  1. 01

    Gypsum or POP, your call

    Branded gypsum board (brands such as Saint-Gobain Gyproc or USG Boral). POP for curves and designer profiles.

  2. 02

    Lighting layout planned

    Downlights placed against your furniture (not generic grids). Cove strips at the right depth. Drop box centred over fan.

  3. 03

    All wiring + electrical

    Standards-compliant concealed wiring, modular switches, dimmer-capable downlights where needed. Concealed within the ceiling.

  4. 04

    Drop boxes + cut-outs

    Fan drop box at the right diameter, AC vents accommodated, smoke detector cut-outs ready for compliance.

  5. 05

    Paint finish included

    Two coats of premium emulsion (brands such as Asian Paints or Berger), colour you choose, primer + putty included.

  6. 06

    Professional installation and finishing

    GI framework fixed true, boards jointed and taped, and cracks and sagging kept at bay through proper framing and clean finishing.

How we work

8–14 days from start to first switch.

  1. Stage 01

    Site visit

    We measure the room, check the existing wiring, discuss the lighting plan you want.

    Day 1

  2. Stage 02

    Design + quote

    Layout drawing, lighting plan, line-item quote that itemises materials.

    3–5 days

  3. Stage 03

    Frame + board + wire

    GI framework, gypsum boards fixed, wiring run, drop boxes formed.

    5–8 days

  4. Stage 04

    Putty, paint, clean

    Joint taping, putty, two coats of paint, fixtures installed, deep clean of room.

    3–5 days

Recent work

Ceilings that
do the lighting.

FAQ

What clients ask before booking.

Tell us about the ceiling.
We’ll draw the lighting.

Book a free consultation across the city. Send a photo of the room — we'll come back with a layout and a number.