Ainthiram Luxe Space
False ceiling installation by Ainthiram in Chennai
Home Makeover · False Ceiling

False Ceiling Design
in Chennai

False ceiling design and installation across Chennai — gypsum, POP, designer profiles. Cove lighting, concealed downlights, drop boxes for fans. Done in 8–14 days, with the dust kept to one room.

What we mean

A ceiling that
does the lighting.

A good false ceiling does three things at once — it hides the wires, it lowers a too-tall room into proportion, and it does the lighting. Cove strips wash the walls. Downlights pinpoint the dining table. A drop box centres the fan.

We design ceilings against the room — what's the function, where does the light need to fall, what's the proportion. Then we draw the layout, run the wiring, install the boards, paint, and clean up.

Gypsum (Saint-Gobain or USG Boral) for most rooms — clean, fast, lower-cost. POP for designer profiles, multi-level work, and curves. Both come with the same workmanship warranty.

Gypsum false ceiling with cove lights
Bedroom with designer ceiling
What's included

Six things in every Ainthiram ceiling.

  1. 01

    Gypsum or POP, your call

    Saint-Gobain Gyproc or USG Boral gypsum boards. POP for curves and designer profiles. Both come with workmanship warranty.

  2. 02

    Lighting layout planned

    Downlights placed against your furniture (not generic grids). Cove strips at the right depth. Drop box centred over fan.

  3. 03

    All wiring + electrical

    BIS-marked Polycab/Finolex cable, modular switches, dimmer-capable downlights where needed. Concealed within the ceiling.

  4. 04

    Drop boxes + cut-outs

    Fan drop box at the right diameter, AC vents accommodated, smoke detector cut-outs ready for compliance.

  5. 05

    Paint finish included

    Two coats of premium emulsion (Asian Paints or Berger), colour you choose, primer + putty included.

  6. 06

    12-month warranty

    Workmanship warranty in writing — covers cracks, sagging, joint failures.

How we work

8–14 days from start to first switch.

  1. 01
    Stage 01

    Site visit

    We measure the room, check the existing wiring, discuss the lighting plan you want.

    Day 1

  2. 02
    Stage 02

    Design + quote

    Layout drawing, lighting plan, line-item quote with brand names.

    3–5 days

  3. 03
    Stage 03

    Frame + board + wire

    GI framework, gypsum boards fixed, wiring run, drop boxes formed.

    5–8 days

  4. 04
    Stage 04

    Putty, paint, clean

    Joint taping, putty, two coats of paint, fixtures installed, deep clean of room.

    3–5 days

FAQ

What clients ask before booking.

Tell us about the ceiling.
We’ll draw the lighting.

Free consultation across Chennai. Send a photo of the room — we'll come back with a layout and a number.