Full Home Renovation
in Chennai
End-to-end home renovation across Chennai — civil, plumbing, electrical, flooring, ceiling, painting, fixtures. One contract, one team, one finish date. Done in 30–90 days.
Not five contractors.
One team.
A full renovation done badly means juggling a civil contractor, an electrician, a plumber, a tile guy, and a painter — each pointing fingers when something doesn't work. Each one slow when the next is waiting on them.
We do all of it. One contract, one supervisor, one crew that overlaps trades intelligently. Civil happens first, then plumbing and electrical (concealed), then flooring and tiling, then ceiling, then painting, then fixtures.
30 days for a small 1BHK refresh. 60 days for a 2BHK. 75–90 days for a 3BHK or whole-house overhaul. Schedule committed in writing.


Eight things in every Ainthiram renovation.
- 01
Civil work
Wall changes, opening up or closing rooms, beam work, plastering. Done with proper structural review where needed.
- 02
Concealed plumbing
CPVC supply lines, PVC drain lines, new shut-offs, kitchen and bathroom rough-in done before tiles.
- 03
Electrical rewiring
BIS-marked Polycab/Finolex cable, new switchboards where you actually need them, modular switches, dedicated AC and geyser circuits.
- 04
Flooring + tiling
Vitrified or as specified, bathroom waterproofing, kitchen tiling, skirting, all detail.
- 05
False ceiling + lighting
Gypsum/POP ceilings with cove and downlights, drop boxes for fans, layered lighting plan.
- 06
Painting + finishes
Premium emulsion (Asian Paints/Berger), accent walls, exterior touch-ups if applicable.
- 07
Fixtures + fittings
Sanitaryware (Jaquar/Kohler), kitchen sink, faucets, switches, light fixtures, fans — supplied or install-only.
- 08
12-month warranty
Single warranty document covering everything we touched. One number to call if anything fails.
30–90 days from move-out to move-in.
- 01Stage 01
Brief + survey
Walk-through of the current home, scope discussion, photos, measurements, structural notes.
Day 1
- 02Stage 02
Design + scope + quote
Floor plan changes (if any), finish selections, line-item quote with brand names.
1–2 weeks
- 03Stage 03
Civil + concealed services
Demolition, wall changes, plumbing rough-in, electrical rough-in. The messy weeks.
10–25 days
- 04Stage 04
Finishes + hand-over
Flooring, ceiling, painting, fixtures, deep clean, snag list, walk-through, written warranty.
20–65 days
Other makeover specialisms
What clients ask before booking.
Tell us about the home.
We’ll bring it back to life.
Free consultation across Chennai. Send photos and a sense of the budget — we'll come back with a renovation scope and a number.