Ainthiram Luxe Spaces
Home Makeover · Full Renovation

Full Home Renovation
in Chennai

End-to-end home renovation across Chennai — civil, plumbing, electrical, flooring, ceiling, painting, fixtures. One contract, one team, one finish date. Typically 30–90 days depending on scope.

Full home renovation by Ainthiram in Chennai
What we mean

Not five contractors.
One team.

A full renovation split across five separate contractors means juggling a civil contractor, an electrician, a plumber, a tile guy, and a painter — with no one owning the result end to end. Each one slow when the next is waiting on them.

We do all of it. One contract, one crew that overlaps trades intelligently. Civil happens first, then plumbing and electrical (concealed), then flooring and tiling, then ceiling, then painting, then fixtures.

Typically around 30 days for a small 1BHK refresh, 60 days for a 2BHK, and 75–90 days for a 3BHK or whole-house overhaul, depending on scope. We share a schedule with milestone dates.

Renovated bedroom
Renovated open-plan home
What's included

Eight things in every Ainthiram renovation.

  1. 01

    Civil work

    Wall changes, opening up or closing rooms, beam work, plastering. Done with proper structural review where needed.

  2. 02

    Concealed plumbing

    CPVC supply lines, PVC drain lines, new shut-offs, kitchen and bathroom rough-in done before tiles.

  3. 03

    Electrical rewiring

    Standards-compliant concealed wiring, new switchboards where you actually need them, modular switches, dedicated AC and geyser circuits.

  4. 04

    Flooring + tiling

    Vitrified or as specified, bathroom waterproofing, kitchen tiling, skirting, all detail.

  5. 05

    False ceiling + lighting

    Gypsum/POP ceilings with cove and downlights, drop boxes for fans, layered lighting plan.

  6. 06

    Painting + finishes

    Premium emulsion (brands such as Asian Paints or Berger), accent walls, exterior touch-ups if applicable.

  7. 07

    Fixtures + fittings

    Branded sanitaryware (brands such as Jaquar or Kohler), kitchen sink, faucets, switches, light fixtures, fans — supplied or install-only.

  8. 08

    Snag-free handover

    A final walk-through, snag list, and deep clean at the end of the project.

How we work

30–90 days from move-out to move-in.

  1. Stage 01

    Brief + survey

    Walk-through of the current home, scope discussion, photos, measurements, structural notes.

    Day 1

  2. Stage 02

    Design + scope + quote

    Floor plan changes (if any), finish selections, line-item quote that itemises materials.

    1–2 weeks

  3. Stage 03

    Civil + concealed services

    Demolition, wall changes, plumbing rough-in, electrical rough-in. The messy weeks.

    10–25 days

  4. Stage 04

    Finishes + hand-over

    Flooring, ceiling, painting, fixtures, deep clean, snag list, walk-through, clean handover.

    20–65 days

Recent work

Old homes,
brought back.

FAQ

What clients ask before booking.

Tell us about the home.
We’ll bring it back to life.

Free first consultation, right across Chennai. Send photos and a sense of the budget — we'll come back with a renovation scope and a number.