Flooring & Tiling Contractor
in Chennai
Flooring and tiling across Chennai homes — vitrified, marble, wooden, vinyl. Bathroom and kitchen tiling. Levelled properly, grouted properly, sealed properly — on a base that's prepared right from the start.

The floor is
half the room.
A floor you don't notice is a floor that's been laid right. The slope is correct. The grout lines are even. The tiles don't sound hollow when you walk on them. The corner cuts are clean.
Most flooring problems trace back to skipped basics — wrong adhesive, no levelling, dry mix in the bedding, grout that wasn't sealed. We get every one of those right.
Vitrified for most rooms (brands such as Kajaria, Somany, or RAK), marble for living rooms with a budget, wooden (engineered or laminate) for bedrooms, vinyl for budget refreshes and rentals.


Six things in every Ainthiram floor.
- 01
Branded tiles, itemised
Branded vitrified tiles (brands such as Kajaria, Somany, RAK, Johnson, or Nitco) selected from sample boards in our office and itemised in the quote.
- 02
Proper bedding + adhesive
Cement bedding for vitrified (no dry mix), tile adhesive for floors above ground floor, marble adhesive for marble. The right material for the job.
- 03
Levelling done right
Self-levelling underlay where needed, tile-by-tile spirit-level checks, no hollow sounds at the end.
- 04
Bathroom slope handled
1:80 to 1:100 fall planned to the drain, waterproofing membrane below tiles, and grouting sealed after it cures.
- 05
Skirting + edge cuts
Matching skirting around walls, clean diagonal cuts at corners, finished edges on door thresholds.
- 06
Snag-free handover and clean-up
Final level and hollow-sound checks, grout lines cleaned up, debris removed, and the floor handed over deep-cleaned.
From old floor to new floor.
- Stage 01
Site visit + tile selection
We measure rooms, suggest tile type by room, bring sample boards.
Day 1
- Stage 02
Quote + sign-off
Line-item quote (tiles, adhesive, labour, demolition, debris removal). Signed before order.
3–5 days
- Stage 03
Demolition + base prep
Existing flooring lifted, debris removed, base levelled and primed.
3–5 days per room
- Stage 04
Lay + grout + seal
Tiles laid, grouted (epoxy on bathroom floors), sealed, deep clean.
5–10 days per room
Floors you
don’t notice.
Other makeover specialisms
What clients ask before booking.
Tell us the rooms.
We’ll bring the tile boards.
A free first visit, anywhere in Chennai. We'll measure, suggest tiles by room, and quote line-item.
